热门标签

telegram营销(www.tel8.vip):MRT3 to bolster building sector

时间:2周前   阅读:2   评论:3

足球博彩公司www.hg108.vip)是一个开放皇冠即时比分、代理最新登录线路、会员最新登录线路、皇冠代理APP下载、皇冠会员APP下载、皇冠线路APP下载、皇冠电脑版下载、皇冠手机版下载的皇冠新现金网平台。足球博彩公司上登录线路最新、新2皇冠网址更新最快,足球博彩公司开放皇冠会员注册、皇冠代理开户等业务。

The MRT3’s three civil turnkey tenders, HLIB Research noted, could offer contracts valued at RM27bil.

PETALING JAYA: The mass rapid transit three (MRT3) project is expected to bolster the construction sector going forward despite the low number of contracts in the first half of the year, according to Hong Leong Investment Bank (HLIB) Research.

“We continue to expect recovery in flows this year mainly driven by the MRT3 rollout in December 2022,” the research house said in a report.

Given that the MRT3 is private finance initiative or PFI-based, risks of delays to foot high subsidies this year may not be substantial, according to HLIB Research.

The MRT3’s three civil turnkey tenders, HLIB Research noted, could offer contracts valued at RM27bil.

HLIB Research believes the mega-project could take off by December 2022 assuming no general elections in between.

The research house noted the civil tender briefings were held recently and the timeline factored in the evaluation period.

“Thereafter, we would expect a string of subcontract awards in the first quarter of 2023 (1Q23).

“Given that the minimum payment moratorium period is two years, contractors with better balance sheets are significantly advantaged in tenders,” it said.

,

telegram营销www.tel8.vip)是一个Telegram群组分享平台。telegram营销包括telegram营销、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。telegram营销为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

“Prior to the aforementioned mega job, we would anticipate the East Coast Rail Link or ECRL, Kuching autonomous rail rapid transit and snippets from various highway projects including in Sabah and Sarawak,” it added.

The research house also noted environmental impact assessment or EIA for the Penang South Reclamation project was also recently resubmitted in May, but progress to be award-ready could be further down the road.

Given the persistent cost pressures, the research house expects margins for contractors to have a significant impact.

“Some private sector contracts do have risk sharing clauses while public sector contracts with design flexibility have built in escalation clauses,” it said.

“However, we believe the majority of contracts are on a fixed lump sum basis,” it added. The research house believes another uncertainty is the dwindling labour supply as replenishment has been slow to come by.

Consequently, this may lead to further upward pressure on labour rates as the situation looks to remain unresolved for the remainder of this year.

“This poses further challenges in the MRT3 rollout considering the scale of the project. There is a potential for crowding out labour for non-MRT contractors,” it said.

The research house has maintained its “neutral” call on the construction sector on the back of soaring material cost that has impacted job flows and margins and possible event risk in the second half of 2022.

“We continue to expect sector coverage earnings to recover this year but we flag rising concerns over the deteriorating labour shortage situation,” it said.

上一篇:Telegram搜索不到:中石油息率近10厘

下一篇:Baccarat:Bodies of 3 family members swept away by floods found

网友评论

  • 2022-09-26 00:14:25

    The defence succeeded in raising reasonable doubt on the prosecution’s case and as such, all the accused are acquitted and discharged of all the charges and the bail to be with returned, said the judge.能上首页不